Cambridge, Cambridgeshire.

Trinity College.

United Kingdom

Trinity College has placed an order for the rehanging of their 16 cwt hour bell for both striking and swing chiming. The rehanging work will take place within the tower cupola with all parts being manufactured and brought to site. A new cast iron counterbalanced head stock will be manufactured, together with an independent crown staple and counterbalanced clapper. The bell will be hung in a cast iron Taylor low side bell frame, and the bell wheel which is only about five years old will be adapted and reused.

Update

  • All cast iron parts have been manufactured.
    The bell has been rehung.