The 12 cwt six in this tower is to be augmented with two treble bells. A new treble bell will be cast and a Taylor stock bell will be tuned to match the ring. The Gillett & Johnston bell frame was installed to carry eight bells when it was moved to Barnoldswick in 2009. New fittings will be manufactured for the treble bells.
* The new treble bell was cast on 3rd August.
* Work to install a new floor is underway.
*The tuning of both new bells is complete.
*The manufacture of the new fittings is underway.
*All is ready for dispatch.